Installation Intructions, How-To's and more...

Be Prepared

Everything you need to install your millwork

General installation instructions are available here for your review and planning. As each situation is different, you'll want to adapt to your specific situation.

For more specific installation requirements, we recommend consulting a qualified professional. This ensures that your installation conforms to local building codes while safeguarding against hazards such as shear, uplift or other engineering-related concerns. For liability reasons, AIC Millworks is limited in the type of advice that we can provide.

Best wishes on your project... reach out if we can be of further assistance or add clarity to the general installation instructions!

Fypon General Finishing
For best results, finish and allow to dry prior to installation. All Fypon® polyurethane products must be finished within 90 days of installation to maintain warranty coverage.
Fypon Scratch & Dent Repair
Use all products and tools per manufacturer guidelines, including ventilation requirements.
Fypon Standard Beams
Always follow applicable code requirements and clearances with other equipment or fixtures per manufacturer recommendations.
Fypon Beam Trusses
Standard woodworking saws and blades can be used for cutting Fypon® polyurethane (PUR) products.
ProSelect Column Wraps
Fypon PVC parts are NOT load bearing. Column wraps are designed to be installed around a properly specified and installed structural post that meets applicable code requirements.
PremiumSelect Column Wraps
These instructions assume that correctly specified structural posts are already properly installed.
EverCedar Column Wraps
Note that the column wrap should not overhang the porch floor and the post may not be centered within the column wrap
Aluminum Column Assembly and Installation
Before performing any work, be sure to refer to and follow all standard industry safety precautions.
Fiberglass Columns, Capitals and Bases
Measure the opening from soffit to floor to determine if the column needs to be shortened for a proper fit.
PVC Beadboard
Prepare the walls by removing existing baseboard, casing and other trim that will interfere with the installation... being careful not to damage moulding you intend to reuse.
LuisLynzie Wood Beams
Draw a grid of the targeted area and map out the location of the ceiling beams.
LuisLynzie Wood Columns
Storage of wood millwork must be in a cool, dry and well-ventilated area. Do not allow wood components to have direct contact with the ground or become wet.
LuisLynzie Wood Wainscoting
Wood products are subject to seasonal expansion and contraction. Allow your millwork to condition to the environment a week prior to installation.
loader
Loading...
loader
Loading...