Installation Intructions, How-To's and more...
Be Prepared
Everything you need to install your millwork
General installation instructions are available here for your review and planning. As each situation is different, you'll want to adapt to your specific situation.
For more specific installation requirements, we recommend consulting a qualified professional. This ensures that your installation conforms to local building codes while safeguarding against hazards such as shear, uplift or other engineering-related concerns. For liability reasons, AIC Millworks is limited in the type of advice that we can provide.
Best wishes on your project... reach out if we can be of further assistance or add clarity to the general installation instructions!
-
- For best results, finish and allow to dry prior to installation. All Fypon® polyurethane products must be finished within 90 days of installation to maintain warranty coverage.
-
- Use all products and tools per manufacturer guidelines, including ventilation requirements.
-
- Always follow applicable code requirements and clearances with other equipment or fixtures per manufacturer recommendations.
-
- Standard woodworking saws and blades can be used for cutting Fypon® polyurethane (PUR) products.
-
- Fypon PVC parts are NOT load bearing. Column wraps are designed to be installed around a properly specified and installed structural post that meets applicable code requirements.
-
- These instructions assume that correctly specified structural posts are already properly installed.
-
- Note that the column wrap should not overhang the porch floor and the post may not be centered within the column wrap
-
- Before performing any work, be sure to refer to and follow all standard industry safety precautions.
-
- Measure the opening from soffit to floor to determine if the column needs to be shortened for a proper fit.
-
- Prepare the walls by removing existing baseboard, casing and other trim that will interfere with the installation... being careful not to damage moulding you intend to reuse.
-
- Draw a grid of the targeted area and map out the location of the ceiling beams.
Login and Registration Form